PROJECT ESTIMATE

    What will your SCADA project cost?

    Answer a few questions about your plant. You'll get a price range built from the same model we use for real quotes, and the range tightens the more you can tell us. No drawings needed to start.

    1. 1. Project
    2. 2. Current system
    3. 3. Size
    4. 4. What you have
    5. 5. Features
    6. 6. Delivery
    7. 7. Your estimate
    What kind of project is it?

    This is the biggest single factor in the price.

    Who are we working for?
    What industry is the site in?

    Pick an industry to continue.

    SCADA and ICONICS cost questions

    What drives the price of a SCADA or HMI project, and what the estimate above covers.

    It depends mostly on how many screens and I/O points the system has, how many servers and controllers it connects to, and how much testing and training it needs. Software licenses, hardware and taxes are quoted separately. Answer the questions above for a range built from the same model we use for real quotes.

    The engineering depends on the same things as any SCADA project: screens, I/O points, servers, testing and training. ICONICS licenses depend on the size of the system, so we quote them separately once we know what you need. If you already own your licenses, the estimate above covers the engineering.

    A migration is priced by the size of the system you have today and by the platform it runs on now. Moving up from GENESIS64 v10 takes the least work, GENESIS32 takes more, and systems from other vendors take the most. Each function the current system performs, such as alarms, trends, reports or recipes, adds to the price.

    Most of the uncertainty in a quote comes from what can't be seen yet. With current drawings, tag lists and a documented sequence of operation, the range is narrow. With less on hand, it widens. A short review of what you have lets us replace the range with a firm quote.

    Software licenses, hardware and taxes. Larger projects and repeat work may qualify for volume discounts, which we review when we confirm your quote.